See all cases Case 13 of 14

Closing the design-to-code gap

Delivery speed Scale-up in HealthTech

Cut design-to-engineering back-and-forth to near zero, removing a cost center from the delivery chain and shortening time-to-ship without adding engineering headcount.

The shape of this work
Shape of Work plot for Closing the design-to-code gap
Vehicle — the practitioner Vehicle — collaborators Interface — what was delivered Read the notation
Business outcome

10 x faster spec-to-deploy

Built front-end fluency into the design function, cutting design-to-engineering rework to near zero and spec-to-deploy time by 10x.

Reading the plot
Abstraction concrete
Complexity singular
Scale medium
Playbook move

Know your material.

The engagement

Engagements and outcomes, anonymized. Details on request.

Next case — 14 of 14

A one-person team that runs like a system